| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077106 | Name of Scheme: NUNARI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2216 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Sep-2024 | Actual Date of Completion (Capex): 13-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tubewell | 21.47/122.76 | NUNARI | 26.9897407 | 79.8280985 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 500/58 | NUNARI | 26.9897407 | 79.8280985 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | NUNARI2 | 26.9897407 | 79.8280985 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | di | 80 | 0.002 | Rising mains |
| 2 | di | 100 | 0.02610 | Rising mains |
| 3 | di | 150 | 0.006 | Rising mains |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | hdpe | 90 | 1.932 | Distribution |
| 2 | hdpe | 63 | 2.299 | Distribution |
| 3 | hdpe | 110 | 0.718 | Distribution |
| 4 | hdpe | 140 | 0.383 | Distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 328 |