| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077112 | Name of Scheme: KAREEM NAGAR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2001 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Sep-2024 | Actual Date of Completion (Capex): 04-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.02 M / 121.34 M | KAREEM NAGAR | 79.815899 | 26.944716 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP - 01 | 450 LPM / 56 M | KAREEM NAGAR | 79.815899 | 26.944716 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL / 14 M | KAREEM NAGAR | 79.815899 | 26.944716 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.0035 | |
| 2 | DI | 100 | 0.031 | |
| 3 | DI | 150 | 0.007 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.9749 | |
| 2 | HDPE | 90 | 2.70061 | |
| 3 | HDPE | 110 | 0.8654 | |
| 4 | HDPE | 140 | 0.7867 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 502 |