Project Completion Certificate (Ground Water)
Scheme ID: 20077115 Name of Scheme: UDAITAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2241 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 13-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.06/154.28 UDAITAPUR 26.922443 79.49531
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 500/56 UDAITAPUR 26.922443 79.49531
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 UDAITAPUR 26.922443 79.49531
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0215 RISING MAINS
2 DI 150 0.008 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.574 DITRIBUTION
2 HDPE 63 2.597 DITRIBUTION
3 HDPE 110 0.181 DITRIBUTION
4 HDPE 140 1.506 DITRIBUTION
HSC Connection
Sno. Total Nos.
1 464
Other Details
2.75
2.70
2.75
16-Jul-2024
17-Jul-2024