Project Completion Certificate (Ground Water)
Scheme ID: 20077119 Name of Scheme: KANOULI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2692 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 10-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16.02/122.32 KANOULI 79.736367 26.952138
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 600 LPM/56 M KANOULI 79.736367 26.952138
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 M KANOULI 79.736367 26.952138
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0058 Rising main
2 DI 100 0.0179 Rising main
3 DI 80 0.002 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.38 Distribution
2 HDPE 63 4.40 Distribution
3 HDPE 110 0.675 Distribution
4 HDPE 140 0.528 Distribution
HSC Connection
Sno. Total Nos.
1 618
Other Details
2.39
2.35
2.44
13-Jul-2024
14-Jul-2024