| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077121 | Name of Scheme: BAHISHAR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 4309 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Sep-2024 | Actual Date of Completion (Capex): 04-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 25.02 M / 163.53 M | BAHISHAR | 79.792512 | 26.922813 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP-1 | 900 LPM / 65 M | BAHISHAR | 79.792512 | 26.922813 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250 KL / 18 M | BAHISHAR | 79.792512 | 26.922813 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0079 | |
| 2 | DI | 150 | 0.00695 | |
| 3 | DI | 200 | 0.00665 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.36051 | |
| 2 | HDPE | 90 | 6.0946 | |
| 3 | HDPE | 110 | 2.565 | |
| 4 | HDPE | 140 | 0.4679 | |
| 5 | HDPE | 160 | 0.5856 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 846 |