Project Completion Certificate (Ground Water)
Scheme ID: 20077121 Name of Scheme: BAHISHAR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4309 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 04-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25.02 M / 163.53 M BAHISHAR 79.792512 26.922813
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP-1 900 LPM / 65 M BAHISHAR 79.792512 26.922813
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL / 18 M BAHISHAR 79.792512 26.922813
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0079
2 DI 150 0.00695
3 DI 200 0.00665
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.36051
2 HDPE 90 6.0946
3 HDPE 110 2.565
4 HDPE 140 0.4679
5 HDPE 160 0.5856
HSC Connection
Sno. Total Nos.
1 846
Other Details
431.93
428.98
430.99
07-Jul-2024
08-Jul-2024