Project Completion Certificate (Ground Water)
Scheme ID: 20077125 Name of Scheme: NARMAU GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 4997 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Sep-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 25.06/94.30 NARMAU 27.068633 79.683361
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 1050/66 NARMAU 27.068633 79.683361
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300/14 NARMAU 27.068633 79.683361
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 RISING MAINS
2 DI 150 0.03710 RISING MAINS
3 DI 200 0.0047 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.436 Distribution
2 HDPE 63 9.690 Distribution
3 HDPE 110 1.811 Distribution
4 HDPE 140 0.658 Distribution
5 HDPE 160 0.225 Distribution
6 HDPE 180 0.140 Distribution
HSC Connection
Sno. Total Nos.
1 920
Other Details
4.55
4.49
4.55
10-Aug-2024