Project Completion Certificate (Ground Water)
Scheme ID: 20077252 Name of Scheme: KATEHI No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1501 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 27-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.04/121.35 KATEHI 26.477532 79.806039
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 300/59 KATEHI 26.477532 79.806039
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75/12 KATEHI 26.477532 79.806039
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.415
2 HDPE 90 1.541
3 HDPE 110 0.600
4 HDPE 140 1.392
HSC Connection
Sno. Total Nos.
1 316
Other Details
2.03
0.00
1.65
11-Apr-2024
12-Apr-2024