Project Completion Certificate (Ground Water)
Scheme ID: 20077274 Name of Scheme: Makrandpur Mazra No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1747 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 20-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 10/73.59 MAKRANDPUR MAZRA 26.68114 79.89787
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 400/62 MAKRANDPUR MAZRA 26.68114 79.89787
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/16 MAKRANDPUR MAZRA 26.68114 79.89787
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.091
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.330
2 HDPE 90 1.676
3 HDPE 110 0.245
4 HDPE 125 0.57
5 HDPE 140 1.392
HSC Connection
Sno. Total Nos.
1 278
Other Details
2.66
0.00
1.93
29-Mar-2024
30-Mar-2024