Project Completion Certificate (Ground Water)
Scheme ID: 20077297 Name of Scheme: Laruapur & Nandpur No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 4059 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 09-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 27.06/200.29 LARUAPUR& NANDPUR 26.373269 79.783022
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/60 LARUAPUR& NANDPUR 26.373269 79.783022
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 LARUAPUR& NANDPUR 26.373269 79.783022
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.976
2 HDPE 90 4.518
3 HDPE 110 1.645
4 HDPE 125 1.441
5 HDPE 140 0.331
6 HDPE 160 0.345
HSC Connection
Sno. Total Nos.
1 715
Other Details
4.44
0.00
3.62
14-Apr-2024
15-Apr-2024