Project Completion Certificate (Ground Water)
Scheme ID: 20077312 Name of Scheme: JITPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2019 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.15 Mtr / 99.1 Mtr JITPUR 29.189304 77.73041
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 50 Mtr JITPUR 29.189304 77.73041
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 12 M JITPUR 29.189304 77.73041
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.01920
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.115
2 HDPE 90 0.591
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.78
1.78
1.46
21-Sep-2024
02-Mar-2025