Project Completion Certificate (Ground Water)
Scheme ID: 20077314 Name of Scheme: NAGLA ORDER No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4216 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 07-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.63 Mtr / 105.54 Mtr NAGLA ORDER 29.153152 77.624185
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 900 LPM / 50 Mtr NAGLA ORDER 29.153152 77.624185
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes NAGLA ORDER 29.153152 77.624185
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0059
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.278
2 HDPE 90 0.652
3 HDPE 110 0.231
4 HDPE 125 0.157
5 HDPE 140 0.527
HSC Connection
Sno. Total Nos.
1 388
Other Details
1.44
1.44
1.21
20-Jan-2025