Project Completion Certificate (Ground Water)
Scheme ID: 20077320 Name of Scheme: Hiraman Shiwali No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 1789 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 03-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 16/58.59 HIRAMAN SHIWALI 26.607203 80.01853
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500/60 HIRAMAN SHIWALI 26.607203 80.01853
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/14 HIRAMAN SHIWALI 26.607203 80.01853
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0159
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.648
2 HDPE 90 2.476
3 HDPE 110 2.971
4 HDPE 140 2.010
5 HDPE 160 0.430
HSC Connection
Sno. Total Nos.
Other Details
3.12
0.00
2.33
20-Jul-2024
21-Jul-2024