| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077321 | Name of Scheme: BUBAKPUR | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1629 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 25-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.09 Mtr / 105.11 Mtr | BUBAKPUR | 29.087272 | 77.621626 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 150 LPM / 50 Mtr | BUBAKPUR | 29.087272 | 77.621626 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Direct Pumping Schemes | Direct Pumping Schemes | BUBAKPUR | 29.087272 | 77.621626 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0052 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.832 | |
| 2 | HDPE | 90 | 0.541 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 373 |