Project Completion Certificate (Ground Water)
Scheme ID: 20077331 Name of Scheme: Naubsta No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3349 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 19-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.07/224.32 NAUBASTA 26.495964 80.093431
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800/64 NAUBASTA 26.495964 80.093431
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/16 NAUBASTA 26.495964 80.093431
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.377
2 HDPE 90 4.777
3 HDPE 110 0.907
4 HDPE 125 0.246
5 HDPE 140 0.544
6 HDPE 160 0.963
HSC Connection
Sno. Total Nos.
1 542
Other Details
3.98
0.00
3.24
04-Dec-2024
05-Dec-2024