Project Completion Certificate (Ground Water)
Scheme ID: 20077379 Name of Scheme: JAGDISHPUR & RAMPUR TAPPEWAN No. of Villages: 4 No. of Habitation Covered: 7
Total Population Covered: 3164 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 06-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 98.88/24.44 JAGDISHPUR& RAMPUR TAPPEWAN 26.362697 79.443360
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800/62 JAGDISHPUR& RAMPUR TAPPEWAN 26.362697 79.443360
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 JAGDISHPUR& RAMPUR TAPPEWAN 26.362697 79.443360
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.178
2 HDPE 90 3.467
3 HDPE 110 0.938
4 HDPE 125 1.398
5 HDPE 140 0.973
6 HDPE 160 1.260
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.91
0.00
3.19
20-Jan-2024
21-Jan-2024