Project Completion Certificate (Ground Water)
Scheme ID: 20077384 Name of Scheme: JIGNISH No. of Villages: 2 No. of Habitation Covered: 0
Total Population Covered: 2179 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 07-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23/145.32 JIGNISH 26.458834 79.833639
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550/62 JIGNISH 26.458834 79.833639
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 JIGNISH 26.458834 79.833639
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.781
2 HDPE 90 1.989
3 HDPE 110 0.317
4 HDPE 140 2.930
5 HDPE 160 0.298
HSC Connection
Sno. Total Nos.
1 461
Other Details
3.00
0.00
2.45
22-Mar-2024
23-Mar-2024