Project Completion Certificate (Ground Water)
Scheme ID: 20077446 Name of Scheme: KATHIKA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1729 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 18-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 11/76.59 KATHIKA 26.361806 79.453916
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0092
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.056
2 HDPE 90 1.091
3 HDPE 110 0.303
4 HDPE 140 3.063
5 HDPE 160 1.278
HSC Connection
Sno. Total Nos.
1 438
Other Details
2.68
0.00
2.19
02-May-2024
03-May-2024