Project Completion Certificate (Ground Water)
Scheme ID: 20077474 Name of Scheme: DUDHAUNA WSS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2810 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/81.35 DUDHAUNA 27.708703 79.900145
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 28.56/45 DUDHAUNA 27.708703 79.900145
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 125/12 DUDHAUNA 27.708585 79.900033
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 2.910
2 HDPE/6KG 75 0.720
3 HDPE/6KG 90 0.285
4 HDPE/6KG 110 0.083
5 HDPE/6KG 140 1.090
6 HDPE/6KG 160 0.029
HSC Connection
Sno. Total Nos.
1 462
Other Details
1.70
0.00
1.70
30-Dec-2023
06-Dec-2024