Project Completion Certificate (Ground Water)
Scheme ID: 20077480 Name of Scheme: NIGIHIYA No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2203 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 15-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18 M / 248.33 M NIGOHIYA 26.58245 79.85849
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 500/60 NIGOHIYA 26.58245 79.85849
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 NIGOHIYA 26.58245 79.85849
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.011
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.171
2 HDPE 90 0.583
3 HDPE 110 0.128
4 HDPE 125 0.239
5 HDPE 140 0.592
6 HDPE 160 0.441
7 HDPE 180 0.318
HSC Connection
Sno. Total Nos.
1 219
Other Details
2.45
0.00
2.36
20-Apr-2024
21-Apr-2024