Project Completion Certificate (Ground Water)
Scheme ID: 20077482 Name of Scheme: MAU KHALSA WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3070 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 19-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/96.00 MAU KHALSA 27.893887 79.946123
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 37.92M3/45M MAU KHALSA 27.893887 79.946123
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL-16M MAU KHALSA 27.893768 79.946049
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 2.995
2 HDPE/6KG 75 0.347
3 HDPE/6KG 90 0.413
4 HDPE/6KG 110 0.070
5 HDPE/6KG 140 0.295
6 HDPE/6KG 160 0.562
HSC Connection
Sno. Total Nos.
1 524
Other Details
1.72
0.00
1.72
18-Nov-2024
06-Dec-2024