Project Completion Certificate (Ground Water)
Scheme ID: 20077485 Name of Scheme: SISORI WSS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 10-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/98 SISORI 27.686485 79.819908
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 36.24/45 SISORI 27.686485 79.819908
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 175/12 SISORI 27.687215 79.819562
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 5.496
2 HDPE / 6KG 75 0.443
3 HDPE / 6KG 90 0.584
4 HDPE / 6KG 110 0.509
5 HDPE / 6KG 140 1.879
6 HDPE / 6KG 160 0.0695
HSC Connection
Sno. Total Nos.
1 558
Other Details
2.18
0.00
2.18
09-Nov-2024
06-Dec-2024