| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077486 | Name of Scheme: NIWADA ANI BARIGAON | No. of Villages: 4 | No. of Habitation Covered: 9 |
| Total Population Covered: 3290 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-Feb-2024 | Actual Date of Completion (Capex): 18-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 25/260.38 | NIWADA ANI & BARIGAON | 26.75951 | 79.91066 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 850/62 | NIWADA ANI & BARIGAON | 26.75951 | 79.91066 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/16 | NIWADA ANI & BARIGAON | 26.75951 | 79.91066 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 150 | 0.01050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 5.294 | |
| 2 | HDPE | 63 | 4.728 | |
| 3 | HDPE | 110 | 0.893 | |
| 4 | HDPE | 125 | 0.164 | |
| 5 | HDPE | 140 | 2.113 | |
| 6 | HDPE | 160 | 0.348 | |
| 7 | HDPE | 180 | 0.613 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 617 |