Project Completion Certificate (Ground Water)
Scheme ID: 20077486 Name of Scheme: NIWADA ANI BARIGAON No. of Villages: 4 No. of Habitation Covered: 9
Total Population Covered: 3290 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 18-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 25/260.38 NIWADA ANI & BARIGAON 26.75951 79.91066
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/62 NIWADA ANI & BARIGAON 26.75951 79.91066
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 NIWADA ANI & BARIGAON 26.75951 79.91066
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01050
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.294
2 HDPE 63 4.728
3 HDPE 110 0.893
4 HDPE 125 0.164
5 HDPE 140 2.113
6 HDPE 160 0.348
7 HDPE 180 0.613
HSC Connection
Sno. Total Nos.
1 617
Other Details
4.48
0.00
3.65
02-Apr-2024
03-Apr-2024