Project Completion Certificate (Ground Water)
Scheme ID: 20077550 Name of Scheme: MAIJUSA MASPUR No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2022 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 17-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 10/53.29 MAIJUSAMASPUR 26.79467 79.89410
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0128
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.870
2 HDPE 90 2.280
3 HDPE 110 1.723
4 HDPE 125 1.134
5 HDPE 140 0.368
HSC Connection
Sno. Total Nos.
1 465
Other Details
3.00
0.00
2.44
01-May-2024
02-May-2024