| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20077572 | Name of Scheme: mankapur derapur | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2100 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-Mar-2024 | Actual Date of Completion (Capex): 02-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.04/139.33 | MANKAPUR DERAPUR | 26.3120 | 79.4153 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 450/62 | MANKAPUR DERAPUR | 26.3120 | 79.4153 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/14 | MANKAPUR DERAPUR | 26.3120 | 79.4153 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 100 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.111 | |
| 2 | HDPE | 90 | 1.930 | |
| 3 | HDPE | 125 | 1.216 | |
| 4 | HDPE | 140 | 0.560 | |
| 5 | HDPE | 160 | 0.458 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 448 |