Project Completion Certificate (Ground Water)
Scheme ID: 20077609 Name of Scheme: banaralipur & swarooppur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 4551 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 25-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 6/208.33 BANARALIPUR & SWAROOPPUR 26.378896 79.975849
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 1100/72 BANARALIPUR & SWAROOPPUR 26.378896 79.975849
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325/16 BANARALIPUR & SWAROOPPUR 26.378896 79.975849
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.688
2 HDPE 90 2.549
3 HDPE 110 0.506
4 HDPE 125 0.535
5 HDPE 140 0.168
6 HDPE 160 0.390
7 HDPE 180 0.390
8 HDPE 200 0.974
HSC Connection
Sno. Total Nos.
1 1054
Other Details
3.75
3.75
3.30
25-May-2024
26-May-2024