Project Completion Certificate (Ground Water)
Scheme ID: 20078374 Name of Scheme: gangouli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1604 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 19-Oct-2023 Actual Date of Completion (Capex): 07-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.275
2 HDPE 90 .26290
3 HDPE 110 .22460
4 HDPE 75 1.060
HSC Connection
Sno. Total Nos.
Other Details
1.32
0.02
1.34
18-Jan-2025
19-Jan-2025