Project Completion Certificate (Ground Water)
Scheme ID: 20078443 Name of Scheme: MOHAMMADPUR AKBARPUR CHAKBANDI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1380 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.12 Mtr / 105.41 Mtr MODH. AKBARPUR CHAKBANDI 29.174394 77.676791
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 50 Mtr MODH. AKBARPUR CHAKBANDI 29.174394 77.676791
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes MODH. AKBARPUR CHAKBANDI 29.174394 77.676791
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.004
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.523
2 HDPE 90 0.358
3 HDPE 110 0.138
4 HDPE 125 0.293
HSC Connection
Sno. Total Nos.
1 283
Other Details
1.21
1.21
1.00
01-Nov-2024
02-Nov-2024