Project Completion Certificate (Ground Water)
Scheme ID: 20078466 Name of Scheme: DHANPURA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1654 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 01-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.42 Mtr / 100.11 Mtr DHANPURA 29.014544 77.880009
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 48 Mtr DHANPURA 29.014544 77.880009
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 Kl / 12 M DHANPURA 29.014544 77.880009
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.04512
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.576 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
2 HDPE 90 0.909 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
3 HDPE 110 0.341 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
4 HDPE 125 0.1485 “The cost and quantity indicated are up to SLSSC approval; revised cost and quantity shall be finalized after SLSSC approval of revised DPR.”
HSC Connection
Sno. Total Nos.
1 357
Other Details
1.48
1.48
1.22
21-Oct-2024
22-Oct-2024