Scheme ID: 20078572 Name of Scheme: RASULPUR IKLA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5297 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 45.28 Mtr / 99.04 Mtr RASULPUR-IKLA 28.999361 77.902669
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1100 LPM / 54 Mtr RASULPUR-IKLA 28.999361 77.902669
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325 Kl / 16 M RASULPUR-IKLA 28.999361 77.902669
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.516
2 HDPE 90 2.314
3 HDPE 125 0.233
4 HDPE 140 0.335
5 HDPE 160 0.184
6 HDPE 180 0.298
7 HDPE 200 0.489
HSC Connection
Sno. Total Nos.
1 996
Other Details
4.30
4.30
3.45
21-Aug-2024
07-Oct-2024