Project Completion Certificate (Ground Water)
Scheme ID: 20078808 Name of Scheme: HARAHA WSS No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 1573 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 25-Mar-2023 Actual Date of Completion (Capex): 23-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell - 1 15/70.5 Haraha 26.1319 82.146363
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 330LPM/44M Haraha 26.1319 82.146363
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100KL/14M Haraha 26.131975 82.146258
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE-PN-6 , PE-100 63 7.269
2 HDPE-PN-6 , PE-100 75 2.785
3 HDPE-PN-6 , PE-100 90 0.787
4 HDPE-PN-6 , PE-100 110 0.928
5 HDPE-PN-6 , PE-100 140 0.270
6 HDPE-PN-6 , PE-100 160 0.017
HSC Connection
Sno. Total Nos.
1 259
Other Details
1.69
1.68
1.69
30-Jan-2025
01-Aug-2025