Project Completion Certificate (Ground Water)
Scheme ID: 20078953 Name of Scheme: GUASPUR No. of Villages: 4 No. of Habitation Covered: 6
Total Population Covered: 2990 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 12.0 M / 112.0 M GAUSPUR 25°.8955002"N 81.137625"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 260LPM / 60 M GAUSPUR 25°.8955002"N 81.137625"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.027 KM
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.034
2 HDPE 180 0.1714
3 HDPE 140 1.5602
4 HDPE 125 2.5148
5 HDPE 110 1.4473
6 HDPE 90 1.4231
7 HDPE 75 0.2744
8 HDPE 63 4.4046
HSC Connection
Sno. Total Nos.
1 491
Other Details
3.13
0.00
3.14
07-Feb-2025
08-Feb-2025