Project Completion Certificate (Ground Water)
Scheme ID: 20079124 Name of Scheme: MADURI No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Mar-2024 Actual Date of Completion (Capex): 14-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 400 LPM 17.74 M /129.24 M MADURI 25.946395 80.457954
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.5 HP 400 LPM /57 M MADURI 25.946395 80.457954
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 1 125 KL / 12M MADURI 25.946395 80.457954
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.715
2 HDPE 75 0.120
3 HDPE 90 0.683
4 HDPE 110 0.098
5 HDPE 140 0.064
6 HDPE 200 0.123
HSC Connection
Sno. Total Nos.
Other Details
1.97
0.00
1.97
14-Oct-2024
14-Oct-2024