| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20079124 | Name of Scheme: MADURI | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1850 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Mar-2024 | Actual Date of Completion (Capex): 14-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL 400 LPM | 17.74 M /129.24 M | MADURI | 25.946395 | 80.457954 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 12.5 HP | 400 LPM /57 M | MADURI | 25.946395 | 80.457954 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | 1 | 125 KL / 12M | MADURI | 25.946395 | 80.457954 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.715 | |
| 2 | HDPE | 75 | 0.120 | |
| 3 | HDPE | 90 | 0.683 | |
| 4 | HDPE | 110 | 0.098 | |
| 5 | HDPE | 140 | 0.064 | |
| 6 | HDPE | 200 | 0.123 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |