| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20079261 | Name of Scheme: KUSARI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6472 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 10-Mar-2024 | Actual Date of Completion (Capex): 30-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | DC/RC Drilling including Hiring Transportation, Erection, Dismantling with Loading and unloading of Rig and associated T&P complete in all respect including required all material labour & T&P etc. | 18.01/62.99 | Kusari | 27.558858 | 78.702360 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submerged Pump | 350LPM/42Mtr. | Kusari | 27.558858 | 78.702360 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100KL/12Mtr | Kusari | 27.558818 | 78.702113 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-9 | 80 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE pipe PN-6: Class PE-100 | 160 | 0.497 | |
| 2 | HDPE pipe PN-6: Class PE-100 | 125 | 0.299 | |
| 3 | HDPE pipe PN-6: Class PE-100 | 110 | 0.077 | |
| 4 | HDPE pipe PN-6: Class PE-100 | 90 | 0.203 | |
| 5 | HDPE pipe PN-6: Class PE-100 | 75 | 0.811 | |
| 6 | HDPE pipe PN-6: Class PE-100 | 63 | 2.846 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 449 |