Project Completion Certificate (Ground Water)
Scheme ID: 20080823 Name of Scheme: PITOURA SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5473 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 05-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.05 M / 118.66 M PITOURA 27.52350 79.35933
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 950 LPM / 63 M PITOURA 27.52350 79.35933
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 16 M PITOURA 27.52350 79.35933
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .022 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.743 COMPLETE
2 HDPE 63 9.200 COMPLETE
3 HDPE 110 0.480 COMPLETE
4 HDPE 140 0.145 COMPLETE
5 HDPE 180 0.378 COMPLETE
6 HDPE 200 3.205 COMPLETE
HSC Connection
Sno. Total Nos.
1 1089
Other Details
3.70
3.62
3.85
05-Jul-2024
06-Jul-2024