Scheme ID: 20080826 Name of Scheme: SUBHAN PUR SVS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2492 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 03-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.054
2 HDPE 63 4.337
3 HDPE 110 0.675
4 HDPE 140 0.029
5 HDPE 160 0.032
HSC Connection
Sno. Total Nos.
1 362
Other Details
2.16
2.11
2.16
03-Feb-2025