Project Completion Certificate (Ground Water)
Scheme ID: 20080864 Name of Scheme: JEETHAL SVS (O) No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2762 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 12-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17.72/92.11 Jeehal 28.7475 78.3943
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 600/48 Jeehal 28.7475 78.3943
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 175/16 Jeehal 28.7478 78.3942
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 63 6.4749
2 PN-6 PE100/HDPE 75 1.5413
3 PN-6 PE100/HDPE 90 0.2137
4 PN-6 PE100/HDPE 110 0.0283
5 PN-6 PE100/HDPE 140 0.9005
6 PN-6 PE100/HDPE 160 0.145
HSC Connection
Sno. Total Nos.
1 494
Other Details
2.02
1.96
0.00
22-Dec-2024
23-Dec-2024