Project Completion Certificate (Ground Water)
Scheme ID: 20080874 Name of Scheme: SARBASPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 9
Total Population Covered: 3462 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 12-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 24.02 TW 26.156013 83.4205462
2 Plain Pipe 150mm 51.73 TW 26.156013 83.4205462
3 Housing Pipe 300mm 41.2 TW 26.156013 83.4205462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 760/45 TW 26.156013 83.4205462
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Tank 250/12 OHT 26.156013 83.4205462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.21
2 HDPE Pipe PN-6: Class PE-100 75 0.79
3 HDPE Pipe PN-6: Class PE-100 90 1.15
4 HDPE Pipe PN-6: Class PE-100 110 3.9
5 HDPE Pipe PN-6: Class PE-100 160 0.64
6 HDPE Pipe PN-6: Class PE-100 200 0.31
HSC Connection
Sno. Total Nos.
1 574
Other Details
2.89
2.35
2.51
11-Dec-2025
12-Dec-2025