| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20080877 | Name of Scheme: SINGHASAN VILLAGE WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2394 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jan-2025 | Actual Date of Completion (Capex): 15-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Depth of Plain Pipe (m) | 87.9 | TW | 26.094999 | 83.681901 |
| 2 | Depth of Strainer (m) | 18 | TW | 26.094999 | 83.681901 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 500/46 | PH | 26.094997 | 83.681902 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zinc Tank | 150/12 | OHT | 26.094997 | 83.681902 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K9 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN6 PE100 | 63 | 5.75 | |
| 2 | HDPE PN6 PE100 | 75 | 0.98 | |
| 3 | HDPE PN6 PE100 | 90 | 0.45 | |
| 4 | HDPE PN6 PE100 | 110 | 0.75 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 335 |