Project Completion Certificate (Ground Water)
Scheme ID: 20081358 Name of Scheme: BASOHARI WSS No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 2824 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-Mar-2024 Actual Date of Completion (Capex): 19-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 tubwell 18.09/80.72 BASOHARI 26º 29' 59.911" N 82 23 25.425" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 22.8/45 22.8/45 BASOHARI 26º 29' 59.911" N 82 23 25.425" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100/14 BASOHARI 26º 29' 59.911" N 82 23 25.425" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 80 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.104
2 HDPE Pipe PN-6: Class PE-100 75 1.172
3 HDPE Pipe PN-6: Class PE-100 90 2.167
4 HDPE Pipe PN-6: Class PE-100 110 .882
5 HDPE Pipe PN-6: Class PE-100 140 0.206
HSC Connection
Sno. Total Nos.
1 310
Other Details
1.63
0.00
0.00
20-Mar-2025
21-Mar-2025