Project Completion Certificate (Ground Water)
Scheme ID: 20081413 Name of Scheme: KAYAMUDDINPUR WSS No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3320 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 06-Oct-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well assembly 24/97.79 Kayamuddinpur 26.434404 82.604611
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pump 40.96/46 Kayamuddinpur 26.434407 82.604614
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 200/16 Kayamuddinpur 26.434402 82.604609
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K7 150 14.80
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90mm dia HDPE Pipe 90 0.78
2 75mm dia HDPE Pipe 75 0.49
3 63mm dia HDPE Pipe 63 6.45
4 110mm dia HDPE Pipe 110 0.60
5 140mm dia HDPE Pipe 140 1.44
6 160mm dia HDPE Pipe 160 0.88
7 200mm dia HDPE Pipe 200 0.02
HSC Connection
Sno. Total Nos.
1 410
Other Details
2.85
2.80
2.80
06-Oct-2026
07-Oct-2026