Project Completion Certificate (Ground Water)
Scheme ID: 20081706 Name of Scheme: HARSINGHPUR GAHILWAR & GALAR PUR MVS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3209 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 10-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22M/233.36m HARSINGHPUR GAHILWAR 27.55957 79.59975
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibel Pump 700LPM/61M HARSINGHPUR GAHILWAR 27.55957 79.59975
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/14M HARSINGHPUR GAHILWAR 27.55957 79.59975
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 20.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1366.00
2 HDPE 63 6906.00
3 HDPE 110 292.00
4 HDPE 140 1200.00
5 HDPE 160 183.00
6 HDPE 180 228.00
HSC Connection
Sno. Total Nos.
1 448
Other Details
3.25
3.13
3.15
25-May-2024
26-May-2024