| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20082303 | Name of Scheme: KALFANPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2020 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Feb-2025 | Actual Date of Completion (Capex): 02-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe (m) | 38.79 | TW | 26.089236 | 83.513573 |
| 2 | Slotted pipe (m) | 24 | TW | 26.089236 | 83.513573 |
| 3 | Housing Pipe (m) | 47.51 | TW | 26.089236 | 83.513573 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 450/45 | TW | 26.089236 | 83.513573 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINC | 150 | 12 | 26.089236 | 83.513573 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K 7 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE100 | 63 | 6.86 | |
| 2 | HDPE PN-6 PE100 | 75 | 0.22 | |
| 3 | HDPE PN-6 PE100 | 90 | 0.4 | |
| 4 | HDPE PN-6 PE100 | 110 | 0.11 | |
| 5 | HDPE PN-6 PE100 | 140 | 0.16 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 527 |