Project Completion Certificate (Ground Water)
Scheme ID: 20082324 Name of Scheme: NEMDAHNR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3303 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Jul-2024 Actual Date of Completion (Capex): 23-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 24 TW 26.097210 83.7518527
2 Plain Pipe 150mm 56.6 TW 26.097210 83.7518527
3 Housing Pipe 300mm 41.7 TW 26.097210 83.7518527
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 655/45 TW 26.097210 83.7518527
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 200/12 OHT 26.097210 83.7518527
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.24
2 HDPE Pipe PN-6: Class PE-100 75 1.76
3 HDPE Pipe PN-6: Class PE-100 90 0.97
4 HDPE Pipe PN-6: Class PE-100 110 1.75
5 HDPE Pipe PN-6: Class PE-100 140 0.07
HSC Connection
Sno. Total Nos.
1 512
Other Details
2.19
1.79
1.85
27-Feb-2026
23-Mar-2026