| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20082399 | Name of Scheme: THAURA & SUMERPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 6 |
| Total Population Covered: 5189 | Base Year: 2022 | Intermediate Year: 2034 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Mar-2025 | Actual Date of Completion (Capex): 08-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 MM | 12.80 | Thaura Sumerpur | 26.203191 | 81.841983 |
| 2 | 150 MM | 12.80 | Thaura Sumerpur | 26.203191 | 81.841983 |
| 3 | 300 MM SLOTTED PIPE | 24 | Thaura Sumerpur | 26.203191 | 81.841983 |
| 4 | 150 MM SLOTTED PIPE | 9.0 | Thaura Sumerpur | 26.203191 | 81.841983 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 01 | 870/54 | Thaura Sumerpur | 26.203191 | 81.841983 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | 01 | 250/16 | Thaura Sumerpur | 26.203191 | 81.841983 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 3.97 | |
| 2 | HDPE PIPE | 63 | 14.02 | |
| 3 | HDPE PIPE | 110 | 2.28 | |
| 4 | HDPE PIPE | 140 | 2.81 | |
| 5 | HDPE PIPE | 160 | 2.07 | |
| 6 | HDPE PIPE | 200 | 0.14 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 754 |