Project Completion Certificate (Ground Water)
Scheme ID: 20082427 Name of Scheme: BHADAR & GHORHA RO WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 16
Total Population Covered: 9386 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 26-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 132.10 BHADAR & GHORHA 26.12285 81.93406
2 300MM PLAIN PIPE 102.00 BHADAR & GHORHA 26.12285 81.93406
3 150MM SLOTTED PIPE 24.00 BHADAR & GHORHA 26.12285 81.93406
4 300MM SLOTTED PIPE 30.00 BHADAR & GHORHA 26.12285 81.93406
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMMURSIBLE PUMP 780 LPM / 58 M BHADAR & GHORHA 26.12285 81.93406
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500KL / 20M BHADAR & GHORHA 26.12285 81.93406
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 1.092
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 12.178
2 HDPE PIPE 63 25.025
3 HDPE PIPE 110 1.058
4 HDPE PIPE 125 1.505
5 HDPE PIPE 140 0.657
6 HDPE PIPE 160 0.394
7 HDPE PIPE 180 0.458
HSC Connection
Sno. Total Nos.
1 1252
Other Details
8.08
0.00
7.95
28-Aug-2024
10-Dec-2024