| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20082427 | Name of Scheme: BHADAR & GHORHA RO WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 16 |
| Total Population Covered: 9386 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Dec-2024 | Actual Date of Completion (Capex): 26-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 132.10 | BHADAR & GHORHA | 26.12285 | 81.93406 |
| 2 | 300MM PLAIN PIPE | 102.00 | BHADAR & GHORHA | 26.12285 | 81.93406 |
| 3 | 150MM SLOTTED PIPE | 24.00 | BHADAR & GHORHA | 26.12285 | 81.93406 |
| 4 | 300MM SLOTTED PIPE | 30.00 | BHADAR & GHORHA | 26.12285 | 81.93406 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMMURSIBLE PUMP | 780 LPM / 58 M | BHADAR & GHORHA | 26.12285 | 81.93406 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500KL / 20M | BHADAR & GHORHA | 26.12285 | 81.93406 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 1.092 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 12.178 | |
| 2 | HDPE PIPE | 63 | 25.025 | |
| 3 | HDPE PIPE | 110 | 1.058 | |
| 4 | HDPE PIPE | 125 | 1.505 | |
| 5 | HDPE PIPE | 140 | 0.657 | |
| 6 | HDPE PIPE | 160 | 0.394 | |
| 7 | HDPE PIPE | 180 | 0.458 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1252 |