Project Completion Certificate (Ground Water)
Scheme ID: 20082545 Name of Scheme: BHUNI KAKKEPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 6581 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 28-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 49.51 Mtr / 96 Mtr KAKKEPUR 29.116249 77.576096
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1250 LPM / 54 Mtr KAKKEPUR 29.116249 77.576096
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 16 M KAKKEPUR 29.116249 77.576096
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.023 ing work done in Kakkepur Only
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.644 This is a multi-village scheme comprising two villages, Bhuni and Kakkepur. The work has been completed in Kakkepur, but in Bhuni, no work could be initiated due to villagers dispute. Hence, partial O&M has been started.
2 HDPE 90 1.933 This is a multi-village scheme comprising two villages, Bhuni and Kakkepur. The work has been completed in Kakkepur, but in Bhuni, no work could be initiated due to villagers dispute. Hence, partial O&M has been started.
3 HDPE 110 0.244 This is a multi-village scheme comprising two villages, Bhuni and Kakkepur. The work has been completed in Kakkepur, but in Bhuni, no work could be initiated due to villagers dispute. Hence, partial O&M has been started.
4 HDPE 125 0.172 This is a multi-village scheme comprising two villages, Bhuni and Kakkepur. The work has been completed in Kakkepur, but in Bhuni, no work could be initiated due to villagers dispute. Hence, partial O&M has been started.
5 HDPE 200 0.302 This is a multi-village scheme comprising two villages, Bhuni and Kakkepur. The work has been completed in Kakkepur, but in Bhuni, no work could be initiated due to villagers dispute. Hence, partial O&M has been started.
HSC Connection
Sno. Total Nos.
1 700
Other Details
5.49
5.49
2.98
18-Nov-2024
19-Nov-2024