Project Completion Certificate (Ground Water)
Scheme ID: 20082564 Name of Scheme: MOR KHURD & SADARPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 6615 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 45.19 Mtr / 99.04 Mtr MOR KHURD - SADARPUR 29.222438 77.980176
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1350 LPM / 56 Mtr MOR KHURD - SADARPUR 29.222438 77.980176
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 Kl / 18 M MOR KHURD - SADARPUR 29.222438 77.980176
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.721
2 HDPE 90 4.0
3 HDPE 110 0.418
4 HDPE 140 0.178
5 HDPE 160 0.340
HSC Connection
Sno. Total Nos.
1 1118
Other Details
4.96
4.96
4.06
22-Jan-2025
23-Jan-2025