Project Completion Certificate (Ground Water)
Scheme ID: 20082899 Name of Scheme: Shahpur Chamraha No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2150 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Dec-2024 Actual Date of Completion (Capex): 22-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12 M/ 82.1 M Shahpur Chamraha 27.989754 80.33238
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.2 M³ per Min /45Mtr Shahpur Chamraha 27.989754 80.33238
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL / 16 Mtr Shahpur Chamraha 27.989724 80.3324
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.555
2 HDPE Pipe PN-6, Class PE-100 75 2.3588
3 HDPE Pipe PN-6, Class PE-100 90 1.3264
4 HDPE Pipe PN-6, Class PE-100 110 1.700
5 HDPE Pipe PN-6, Class PE-100 140 0.940
HSC Connection
Sno. Total Nos.
1 315
Other Details
1.85
0.00
1.85
21-Jun-2024
24-Dec-2024