Project Completion Certificate (Ground Water)
Scheme ID: 20083009 Name of Scheme: GESUPUR SUMARLI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3037 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 05-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 33.74 Mtr / 111.39 Mtr GESUPUR SUMARLI 28.940094 78.018538
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 50 Mtr GESUPUR SUMARLI 28.940094 78.018538
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 14 M GESUPUR SUMARLI 28.940094 78.018538
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0302
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.027
2 HDPE 90 0.638
3 HDPE 110 0.3509
4 HDPE 125 0.479
HSC Connection
Sno. Total Nos.
1 599
Other Details
2.65
2.65
2.18
20-Sep-2024
11-Apr-2025