Project Completion Certificate (Ground Water)
Scheme ID: 20083037 Name of Scheme: LAUSHADH VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3426 Base Year: 2022 Intermediate Year: 2036 Design Year: 2052
Date of Completion (As per Contract): 20-Jul-2024 Actual Date of Completion (Capex): 25-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Plain Pipe (m) 121.37 TW 25.189738 83.887426
2 Depth of Strainer (m) 18 TW 25.189738 83.887426
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 680/48 TW 25.189738 83.887426
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc tank 225/12 OHT 25.189738 83.887426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 100 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.17
2 HDPE 75 1.44
3 HDPE 90 0.85
4 HDPE 110 0.48
5 HDPE 140 1.38
6 HDPE 160 0.02
HSC Connection
Sno. Total Nos.
1 528
Other Details
2.34
2.29
1.94
25-Apr-2025
20-Sep-2025